COLD STORAGE
5,000 TON ENGINE ROOM COMPLEX – PHASE I
Design/Build turnkey construction of state of the art complex. Project included site layout, building, structural, pipe bridges, refrigeration and electrical design and installation. Installation included (4) 500 hp Mycom screw compressors, (1)150 hp Vilter Reciprocating compressor, (4) 550 ton BAC condenser one connection in, one out. 144” recirculator, 108” high pressure receiver, 60” thermosyphon vessel, Allen Bradley PLC and INTOUCH graphics. We ran all electrical underground and provided electrical distribution. Fast tracked project start to finish in eight months. This complex handles all Not-From-Concentrate (NFC) cold storage.
5,000 TON ENGINE ROOM COMPLEX – PHASE I
Design/Build turnkey construction of state of the art complex. Project included site layout, building, structural, pipe bridges, refrigeration and electrical design and installation. Installation included (4) 500 hp Mycom screw compressors, (1)150 hp Vilter Reciprocating compressor, (4) 550 ton BAC condenser one connection in, one out. 144” recirculator, 108” high pressure receiver, 60” thermosyphon vessel, Allen Bradley PLC and INTOUCH graphics. We ran all electrical underground and provided electrical distribution. Fast tracked project start to finish in eight months. This complex handles all Not-From-Concentrate (NFC) cold storage.