BAKERY
GLYCOL CHILLER SYSTEM
Installation of a new flooded R-507 Glycol System with BAC induced draft evaporative condenser, V Series Mycom Screw Compressors, Alfa Laval Plate/Frame Chiller, Thermosyphon Vessel Accumulator, and a B & G Pumps with 2000 gallon stainless steel reservoir. This included installation of new Cleaver Brooks Boiler, water softeners, water make-up system, steam & all utility piping.
Installation of a new flooded R-507 Glycol System with BAC induced draft evaporative condenser, V Series Mycom Screw Compressors, Alfa Laval Plate/Frame Chiller, Thermosyphon Vessel Accumulator, and a B & G Pumps with 2000 gallon stainless steel reservoir. This included installation of new Cleaver Brooks Boiler, water softeners, water make-up system, steam & all utility piping.
FACILITY EXPANSION
(1) BAC evaporative condenser, (3) FES Compressors, (1) Heat Exchanger, (2) Teikoku Low Temp Recirculator Pumps (1) Low Temp Recirculator, (1) High Pressure / T-Syphon Receiver, (1) Accumulator / Flash Economizer and (11) Evapco Evaporators. This project included an underfloor warming grid.
(1) BAC evaporative condenser, (3) FES Compressors, (1) Heat Exchanger, (2) Teikoku Low Temp Recirculator Pumps (1) Low Temp Recirculator, (1) High Pressure / T-Syphon Receiver, (1) Accumulator / Flash Economizer and (11) Evapco Evaporators. This project included an underfloor warming grid.