CITRUS PLANT
TURNKEY INSTALLATION OF NEW ENGINE ROOM
Project included (2) Vilter 448 compressors, (1) IMECO 185 ton condenser, (1) 36” H.P. receiver, (1) ALFAL LAVAL 300 GPM propylene glycol chiller with 36” mounted accumulator. Single strength expansion cooling medium 30% propylene glycol. The glycol consisted of (1) 1,200 gallon insulated tank with (2) 300 GPM B & G pumps with associated piping and valves.
TURNKEY INSTALLATION OF NEW ENGINE ROOM
Project included (2) Vilter 448 compressors, (1) IMECO 185 ton condenser, (1) 36” H.P. receiver, (1) ALFAL LAVAL 300 GPM propylene glycol chiller with 36” mounted accumulator. Single strength expansion cooling medium 30% propylene glycol. The glycol consisted of (1) 1,200 gallon insulated tank with (2) 300 GPM B & G pumps with associated piping and valves.